# Writing a VAPT RFP That Gets Comparable Quotes

Most VAPT tenders return responses that cannot be compared. Four ways an RFP causes that, and what to specify instead so three proposals answer the same question.

Published

18 August 2026

Last updated

19 November 2026

Reading time

3 min

By

Abhinav A

Filed under

VAPT · Procurement

On this page (6)

Three proposals arrive. One is forty pages and quotes a fixed price. One is six pages and quotes a day rate. One quotes two figures depending on an assumption nobody asked them to make. They cannot be compared, and the reason is almost always in the document that was issued to them.

Four drafting mistakes cause most of it.

## 1\. Specifying the method instead of the target

The most common, and the most counterproductive. An RFP that runs to several pages on required methodology, tooling and certifications, and half a paragraph on what is actually being tested.

This inverts the effort. Vendors respond by restating your methodology section back to you, because that is what they are being scored on, and every proposal becomes identical on the things you specified and silent on the things you did not. Meanwhile they still have to guess the scope, and each one guesses differently. That is where the price variance comes from.

**Specify the target precisely; state the methodology as a minimum standard and stop.** Naming [OWASP WSTG or NIST SP 800-115](https://b52security.com/resources/standards-mapping/) as a floor is enough. What you want back is how _they_ would approach _your_system. That is the part that differentiates them.

## 2\. Leaving the API ambiguous

This one line accounts for more quote variance than anything else in a VAPT tender. "Test our web application" is read by one vendor as the interface, by another as the interface plus the API behind it. Those are materially different pieces of work, and the cheaper proposal is frequently the one that assumed less.

State explicitly whether the API is in scope as a target in its own right or only incidentally as the thing the front end talks to. The same applies to administrative interfaces, which are often a separate application wearing the same brand, and to mobile clients, where two platforms plus a shared backend is three targets, not one. The counting is in[how a VAPT scope gets sized](https://vapt.in/blog/how-a-vapt-scope-gets-sized/).

## 3\. Not publishing the evaluation criteria

If vendors do not know how they will be scored, they optimise for the thing tenders usually reward: price. You then receive three proposals competing on cost and discover that the cheapest quoted fewer days.

Publishing the weights changes the responses you get. If technical approach carries more weight than price, proposals will spend their effort on technical approach. Set the weights before any proposal arrives, so they are a decision and not a justification.

Ask for the price broken into **tester-days** plus reporting, with retesting itemised separately. That single instruction makes otherwise incomparable proposals comparable, because it forces every vendor onto the unit they all price in.

## 4\. Timelines that price in risk you did not intend

Two failures here. Asking for delivery inside a window that does not fit the work produces either a declined bid or a padded price. And running the tender so that testing finishes days before a deadline leaves no room for remediation or the retest, which is the artefact the deadline usually exists for.

Work backwards from the date you need the closure document: retest, then remediation, then reporting, then testing, then mobilisation. The result is usually earlier than expected, and it is the single most useful number in the RFP.

## What to include, briefly

Scope, with exclusions and the reason for each. Roles and how many accounts will be provided. Environment, described accurately. Any hard constraints: change freezes, third-party components you cannot authorise. Methodology as a floor. Deliverables, including whether retesting and a closure document are required. Evaluation criteria with weights. The timeline, derived backwards.

Send all three vendors the same document. Otherwise you are comparing quotes for different work.

## Two questions to ask in the response

Neither can be answered generically.

- _What proportion of the engagement is manual, and what will the manual portion be spent on?_ A credible answer names activities: authorisation testing across roles, business logic review of named workflows. An evasive one describes proprietary technology.
- _Given this system, what information would you want from us, and what would you do differently without it?_ A tester who has thought about your system will answer specifically; one who has not will restate definitions. The background to that question is in[black, grey and white box testing](https://vapt.in/blog/black-grey-and-white-box-testing/).

Security Brigade publishes a[VAPT vendor evaluation and RFP template](https://vapt.in/resources/vapt-rfp-template/). It gives you the section structure, the requirement wording and a default set of evaluation weights to fill in and issue yourself. It names no vendor.

About the author

###  Abhinav A 

Lead — VAPT & Security Assessments

Leads Security Brigade’s VAPT delivery team. Has executed advanced penetration tests across BFSI, fintech, QSR and telecom.

[LinkedIn](https://www.linkedin.com/in/abhinavawasthi786/) 

Applying this to your own estate

## Get a VAPT scoped against what you actually run.

Application count, environment, regulator and evidence deadline are what move a scope. A template does not know any of them. Describe your estate and you will get the scope, the cost and the retest cadence in writing. Security Brigade is CERT-In empanelled and publishes this site.

The scope, deliverable and evidence clauses to put in front of a vendor, with a like-for-like pricing schedule so quotes arrive comparable.

[What a VAPT engagement covers](https://vapt.in/vapt-services/)[Scope your test](https://vapt.in/scope/)

[VAPT RFP Template](https://vapt.in/resources/vapt-rfp-template/)[Talk to our team](https://vapt.in/contact/?service=vapt)

## Continue reading

[All articles →](https://vapt.in/blog/)

[Comparing Two CERT-In Empanelled VendorsOnce both firms are empanelled, the empanelment stops helping. What the public register already tells you about each, and the three differences that survive the bar.](https://vapt.in/blog/comparing-two-empanelled-vendors/)[How to Check an Auditor Is Really CERT-In EmpanelledEmpanelment is claimed more often than it is checked. The register is a public PDF, it takes two minutes to search, and it carries more about each firm than the claim itself, including how many audits they say they ran last year.](https://vapt.in/blog/how-to-check-cert-in-empanelment/)[What Moves the Price of a Penetration TestQuotes for the same system arrive at wildly different numbers, and the reason is almost never margin. Testing is sold in tester-days, and the things that move the day count are knowable before you ask anyone for a price.](https://vapt.in/blog/what-moves-the-price-of-a-penetration-test/)